Backfilling
Soil application, embankment, and backfilling with soil material
This page was translated from German using artificial intelligence. The translation may contain errors or inaccuracies. In case of doubt, the German original version prevails.
If you place soil material, fill terrain depressions, or create a rootable soil layer, the soil must not be damaged as a result.
Anyone who wants to place or embank more than 500 m³ of soil or soil material must notify the Lower Soil Protection Authority at least 2 weeks before the start of the measure. This also applies if you commission a company to do so.
Affected parties include:
-
Builders
-
Gardening and landscaping companies
-
Farmers with agriculturally used areas
Without approval by the Lower Soil Protection Authority, this soil material may not be deposited. Further information can be found in the information sheet on the placement and incorporation of materials on and into soils in the download section. A form for the notification of soil application according to § 6 Abs. 8 BBodSchV is available in the download section.
A separate notification according to § 6 Abs. 8 BBodSchV is not required if the soil embankment is already part of a binding remediation plan according to § 13 Abs. 6 BBodSchG or another official decision (e.g., building application) involving the Lower Soil Protection Authority.
The legal requirements for the placement and incorporation of materials into the soil are described in the following regulations:
-
§§ 6 to 8 of the Federal Soil Protection and Contaminated Sites Ordinance (BBodSchV) as amended on 09.07.2021
-
§ 2 Abs. 2 of the North Rhine-Westphalia State Soil Protection Act (LBodSchG NRW)
Note on recycled building materials
For the use of recycled building materials (RC material), e.g., crushed construction debris or road debris, the requirements of the Substitute Building Material Ordinance (link) apply.
Detailed information on the implementation of §§ 6-8 BBodSchV and the distinction from the Substitute Building Material Ordinance can be found in the “Enforcement Guide to §§ 6-8 BBodSchV – Requirements for the placement and incorporation of materials on or into the soil” (LABO - Federal/State Working Group on Soil Protection, 10.08.2023). This is available in the download section.
Costs
The acceptance and processing of a notification according to § 2 Absatz 2 LBodSchG is subject to a fee.
A fee of €200 to €1,000 is incurred depending on the administrative effort, according to tariff item 4.5.5 of the General Administrative Fees Ordinance NRW.
Downloads
Notification - for the placement and incorporation of materials on and into soils
Information sheet - for notification of the placement and incorporation of materials on and into soils
LABO enforcement guide - Requirements for the placement and incorporation of materials on or into the soil
Placement or deposition of materials on or into a rootable soil layer