Approval of Facilities Under the Federal Immission Control Act (BImSchG)
This page was translated from German using artificial intelligence. The translation may contain errors or inaccuracies. In case of doubt, the German original version prevails.
The establishment and operation of facilities that, due to their nature or operation, are particularly suitable for causing harmful environmental impacts or otherwise endangering, significantly disadvantaging, or significantly disturbing the public or the neighborhood require approval under the provisions of the Federal Immission Control Act (BImSchG).
Which facilities are subject to approval (depending on the type and size of the facility and the achievement of certain performance values) can be found in the 4th Ordinance to the BImSchG - Ordinance on facilities requiring approval.
The approval procedures are carried out in accordance with the provisions of the Ordinance on the Approval Procedure - 9th BImSchV.
Required Documents:
The forms for approval and amendment procedures under §§ 4 and 16 BImSchG as well as for notifications under § 15 paragraphs 1 and 3, § 23a, and § 67 paragraph 2 BImSchG are available on the State Environmental Administration's website in NRW under "Immission Control and Facility Safety/Federal Immission Control Law".
Public Announcement of Approval Procedures Pursuant to § 10 Para. 3 Federal Immission Control Act (BImSchG)
Currently, there are no approval procedures subject to publication pursuant to § 10 Para. 3 BImSchG pending at the Oberbergischer Kreis!
Publications Wind Turbines
Unless otherwise stated, the documents linked below are ZIP files.
Zipped (compressed) files take up less storage space and can be transferred to other devices faster than uncompressed files. Information on "unzipping" (decompressing or unpacking) can be found, among other things, on the website of the Microsoft Support.
Application pursuant to § 4 of the Federal Immission Control Act (BImSchG) for the construction and operation of two wind turbines of the type Enercon E-138 EP3 E3 with an installed capacity of 4,260 kW per turbine, a hub height of 160.0 m, a rotor diameter of 138.25 m, and a total height of 229.13 m.
Application pursuant to § 4 of the Federal Immission Control Act (BImSchG) for the construction and operation of four wind turbines of the type Siemens Gamesa SG 6.6-170 with a total height of 250 m and a rated output of 6,600 kW.
Further Information
Contact
Engelskirchen, Nümbrecht, Wipperfürth
Barbara Eurich
Hückeswagen, Lindlar, Radevormwald
Helene Schatschneider
Bergneustadt, Gummersbach, Marienheide
Niklas Rumpel
Morsbach, Reichshof, Waldbröl, Wiehl
Lisa Freiberger